Kerang Link (VNI West)

Kerang Link (VNI West)

Owner: Transgrid

Client: Lumea

Value: AU$ (confidential)

Info: 330/500kV lines linking Project EnergyConnect and Western Renewables Link (VIC)

Location: Dinawan (NSW) to Bulgana (VIC)

Model: D&C

Scope: ATEC Solutions was engaged by Lumea to prepare a cost plan (estimate) for the construction, operation and maintenance of the proposed HV interconnector. Pricing elements included:

  • Civil works (hardstands, roads and drainage)
  • Substations, transmission towers and lines
  • Secondary systems, protection, SCADA
  • Land and easements
  • Operations and control rooms
  • O&M over 35-year period.